Free resources
For school SLPs

Workload Calculator

Count the full workload, not just direct service minutes. Include the planning, evaluations, meetings, paperwork, and other responsibilities that fill your school day.

Start with the estimates below, then adjust to your district. Enter time only once. Results update as you make changes; no student names or identifying information are needed.

Work setting

Switching settings restores five setting-specific values.

Calculation view

Both views share your recurring time and caseload.

Overall is a one-time school-year picture: yearly evaluations, meetings, and progress reports are spread over your weeks of school to show an average workweek.

Contract & calendar

Your contracted week, school calendar, and caseload.

Your paid contracted workweek; not the hours you actually work.

Overall divides yearly items by these weeks. Enter more than 0 for an annual average.

Fractions are allowed (for example, 0.6). Used for Monthly recurring work and contracted hours.

Count each student once, regardless of session frequency or group size.

01

Direct Services

Pull-out sessions, in-class services, and face-to-face evaluation time.

Pull-out sessions — individual

Count sessions, not students — a student seen twice a week counts as 2 sessions.

Individual row 1

Type any session length.

Individual sessions at this length each week.

Individual row 2

Type any session length.

Individual sessions at this length each week.

Pull-out sessions — groups

Group minutes are per session, not per child. A 30-minute group with 3 children counts as 30 minutes, not 90. Kids per group is context only; it does not multiply the time.

Group line 1

Count each group session once. Exclude individual sessions.

Context only; do not multiply time by this count or add it to caseload.

Minutes per session, not per child. Do not count this time again.

Total direct pull-out hours/week0.0 hrs/week

0.0 direct minutes/week = individual sessions × minutes + group sessions × minutes; then ÷ 60. Kids per group never multiply minutes.

Direct service outside pull-out sessions. Do not count this time in the session builder.

Count initial evaluations completed during the school year, not individual assessment sessions.

Count re-evaluations during the school year. Exclude these meetings from Annual IEP meetings.

Assess the student, interview parents and teachers, and observe. Excludes reports and IEP meetings.

Assessment, interviews, and observations only. Excludes report writing and IEP meetings.

Initial evaluation face-to-face0.0 hrs/week

0 initials × 3 hours/evaluation. ÷ 36 weeks of school.

Re-evaluation face-to-face0.0 hrs/week

0 re-evaluations × 2 hours/evaluation. ÷ 36 weeks of school.

Direct Services subtotal0.0 hrs/week
02

Indirect Services

Work that supports services, including reports, planning, scheduling, collaboration, and RTI/MTSS.

Applied to initials + re-evaluations automatically; no separate count. Excludes direct assessment.

Analyze results + write reports0.0 hrs/week

(0 initials + 0 re-evaluations) × 3 hours/evaluation. ÷ 36 weeks of school. No separate count; Annual IEP meetings do not generate evaluation reports.

Most SLPs case-manage only some of their students — enter how many of the meetings above are yours. Maximum: 0 meetings this year (initials + re-evaluations + Annual IEP meetings). Covers scheduling emails, notices, and parental permission; do not count those emails again below.

Case manager only: scheduling emails, notices, and parental permission. Do not count these emails again below.

Scheduling IEP-related meetings0.0 hrs/week

0 case-managed meetings → 0 hours. Meeting total = 0 initials + 0 re-evaluations + 0 Annual IEP meetings (excluding combined meetings).

Includes AAC programming for 1–3 AAC users. Do not repeat this time in extra planning.

Only planning beyond the planning & lesson design line, such as a more complex AAC mix.

Team and staff meetings, parent consultations, and training teachers, paras, or parents. Excludes IEP meetings.

Include RTI/MTSS work not counted as direct services, screenings, or collaboration.

Additional responsibilities (optional)

Name the responsibility, not a student. Count only time not included in another line.

Time for this responsibility only. Do not count this time again in another line.

Name the responsibility, not a student. Count only time not included in another line.

Time for this responsibility only. Do not count this time again in another line.

Indirect Services subtotal3.5 hrs/week
03

Compliance & Case Management

IEP forms and meetings, progress reports, records, supervision, duties, billing, and travel entered below.

Initial or triennial IEP meeting, including eligibility determination. Excludes assessment, reports, and scheduling.

Evaluation IEP forms + corrections + meetings0.0 hrs/week

(0 initials + 0 re-evaluations) × 2 hours/evaluation. ÷ 36 weeks of school. Includes the initial/triennial IEP meeting where eligibility is determined.

Annual IEP meetings

Standalone annuals only — do not count an annual that is combined with a re-evaluation; those are counted with re-evaluations.

One annual IEP meeting and its forms and corrections. Scheduling is separate.

Annual IEP meeting forms + corrections + meetings0.0 hrs/week

0 Annual IEP meetings × 2 hours/annual. ÷ 36 weeks of school. Combined annual + re-evaluation meetings are excluded.

Copying, due-process files, exit summaries, funding reports, and team communication. Excludes forms counted above.

Report writing only. Overall uses all yearly rounds; Monthly uses one round only when due.

Overall uses this many rounds each year. Monthly uses one round only if due.

Progress reports0.0 hrs/week

10 minutes × 0 students × 4 rounds/year ÷ 60 ÷ 36 weeks of school.

Weekly total for documenting services. Do not count Medicaid billing time here.

Screening time only; not initial evaluations or RTI/MTSS time entered elsewhere.

Travel only, not service time. Entered here but shown separately in the Travel category.

Supervision, duties & committees

Supervision only. Do not count the same time again under collaboration or other supervision.

Only supervision time additional to services and other supervision lines.

Only CF supervision not already counted in another line.

Lunch, arrival, dismissal, or similar assigned duties. Do not include committee work.

School-level committee work only; do not repeat staff meetings or district initiatives.

District initiative work not included in committees, training, or staff meetings.

Time attending professional development, not time training others.

Billing and related documentation only. Excludes daily service logs.

Compliance & Case Management subtotal5.0 hrs/week

Section subtotal includes 0.0 hrs/week of travel. Charts separate it: Compliance 5.0 + Travel 0.0. No double-counting.

04

Other Activities

General communication outside the evaluation and IEP-meeting process.

NOT evaluation/meeting emails — those are in Scheduling. No separate interpreters line — that time is negligible and is included in this line.

Weekly recurring time; yearly tasks averaged across school weeks.

Other Activities subtotal2.5 hrs/week

Ready for a workload conversation

Email my results

Entering an email unlocks the printable summary right here. Your email address is sent to us so we can follow up; your results stay on this page.

Print a copy or choose Save as PDF in your print dialog. No student names are needed.

Solution options

Coming soon — placeholder to wire to paid resources later

Once connected, this section will show options matched to the findings above. No resources are connected or recommended here yet.

Findings it would address

  • Workload is 29.0 hrs/week under contracted time; no over-capacity issue found in these entries.
  • Planning & lesson design: 2.5 hrs/week — a leading time driver to review.
  • Daily service logs: 2.5 hrs/week — a leading time driver to review.
  • General emails & phone calls: 2.5 hrs/week — a leading time driver to review.

Defaults & sources

Category structure: ASHA workload approach. Workload categories follow ASHA's workload approach. Every time, count, and contract default below is a starting estimate, not a published ASHA hour requirement.

Source for every numeric default: The SLP Time Machine planning estimate — adjust to your district. All numbers can be adjusted. Blank or negative inputs count as 0; school weeks must be greater than 0 for Overall averages.

All starting values
In-class / other-setting time
0 minutes/weekThe SLP Time Machine planning estimate — adjust to your district
Initial evaluations
0 count/yearThe SLP Time Machine planning estimate — adjust to your district
Re-evaluations
0 count/yearThe SLP Time Machine planning estimate — adjust to your district
Initial evaluation face-to-face time
3 hours/evaluationThe SLP Time Machine planning estimate — adjust to your district
Re-evaluation face-to-face time
2 hours/evaluationThe SLP Time Machine planning estimate — adjust to your district
Analyze results + write report
3 hours/evaluationThe SLP Time Machine planning estimate — adjust to your district
Scheduling IEP-related meetings
On-site: 0.5; Virtual: 1 hours/meetingThe SLP Time Machine planning estimate — adjust to your district
Planning & lesson design
2.5 hours/weekThe SLP Time Machine planning estimate — adjust to your district
Extra planning (non-typical mix)
0 hours/weekThe SLP Time Machine planning estimate — adjust to your district
Collaboration & training
1 hours/weekThe SLP Time Machine planning estimate — adjust to your district
RTI/MTSS activities (optional)
0 hours/weekThe SLP Time Machine planning estimate — adjust to your district
IEP forms + corrections + evaluation IEP meeting
2 hours/evaluationThe SLP Time Machine planning estimate — adjust to your district
Annual IEP meetings
0 count/yearThe SLP Time Machine planning estimate — adjust to your district
Annual IEP meeting forms + corrections + meeting
2 hours/annualThe SLP Time Machine planning estimate — adjust to your district
IEP paperwork (ongoing)
0.5 hours/weekThe SLP Time Machine planning estimate — adjust to your district
Progress report time per student per round
10 minutes/student/roundThe SLP Time Machine planning estimate — adjust to your district
Students on caseload
0 student countThe SLP Time Machine planning estimate — adjust to your district
Daily service logs
2.5 hours/weekThe SLP Time Machine planning estimate — adjust to your district
Screenings (optional)
0 hours/weekThe SLP Time Machine planning estimate — adjust to your district
Travel between sites
0 minutes/weekThe SLP Time Machine planning estimate — adjust to your district
Supervise support personnel
0 hours/weekThe SLP Time Machine planning estimate — adjust to your district
Supervise grad student
0 hours/weekThe SLP Time Machine planning estimate — adjust to your district
Supervise CF
0 hours/weekThe SLP Time Machine planning estimate — adjust to your district
School duties
0 hours/weekThe SLP Time Machine planning estimate — adjust to your district
School committees
0 hours/weekThe SLP Time Machine planning estimate — adjust to your district
District-wide initiatives
0 hours/weekThe SLP Time Machine planning estimate — adjust to your district
Attend professional development
0 hours/weekThe SLP Time Machine planning estimate — adjust to your district
Medicaid billing
2 hours/weekThe SLP Time Machine planning estimate — adjust to your district
General emails & phone calls
On-site: 2.5; Virtual: 4 hours/weekThe SLP Time Machine planning estimate — adjust to your district
Contracted hours
40 hours/weekThe SLP Time Machine planning estimate — adjust to your district
Weeks of school per year
36 weeks/yearThe SLP Time Machine planning estimate — adjust to your district
Weeks worked this month
4 weeks/monthThe SLP Time Machine planning estimate — adjust to your district
Initials this month
0 count/monthThe SLP Time Machine planning estimate — adjust to your district
Re-evaluations this month
0 count/monthThe SLP Time Machine planning estimate — adjust to your district
Annual IEP meetings this month
0 count/monthThe SLP Time Machine planning estimate — adjust to your district
Individual sessions (free-entry rows)
2 empty rows: 0 minutes/session and 0 sessions/week each. Type any session length and count; add or remove rows as needed. The SLP Time Machine planning estimate — adjust to your district.
Group sessions
1 empty row: 0 sessions/week, 0 kids/group, 0 minutes/session. The SLP Time Machine planning estimate — adjust to your district.
Additional responsibilities
2 blank label lines, each 0 hours/week. The SLP Time Machine planning estimate — adjust to your district.
Progress-report rounds
Quarterly: 4 rounds/year (default); Trimester: 3; Semester: 2. The SLP Time Machine planning estimate — adjust to your district.
Setting, view, and month
On-site; Overall; November 2026. Case-managed meetings: 0. Progress reports due this month: No. These are editable starting selections, not ASHA recommendations.

Five display categories: Direct Services, Indirect Services, Compliance & Case Management, Other Activities, and Travel. Travel is separated from the Compliance entry area so it is never counted twice.

The SLP Time Machine

Workload Calculator — summary

School-year weekly average · On-site

Workload breakdown

CategoryHours (hrs/week)Share
Direct Services0.00.0%
Indirect Services3.531.8%
Compliance & Case Management5.045.5%
Other Activities2.522.7%
Travel0.00.0%
Total workload11.0100%

Travel is entered under Compliance but counted only in its own category.

Time drivers

Activityhrs/week
Planning & lesson design2.5
Daily service logs2.5
General emails & phone calls2.5
Medicaid billing2.0
Collaboration & training1.0
IEP paperwork (ongoing)0.5

Assumptions used

Caseload: 0 students. Contract: 40 hours/week. 36 school weeks; 0 initials, 0 re-evaluations, 0 Annual IEP meetings; 4 progress-report rounds/year. Case manager for 0 of 0 meetings.

Adjusted time estimates: initial assessment 3 hours/evaluation; re-evaluation assessment 2 hours/evaluation; reports 3 hours/evaluation; evaluation IEP forms/meetings 2 hours/evaluation; Annual IEP meetings 2 hours/annual; scheduling 0.5 hours/meeting; progress reports 10 minutes/student/round.

Workload categories follow ASHA's workload approach.

The SLP Time Machine planning estimate — adjust to your district. These estimates are not a mandated staffing standard.

theslptimemachine.com/workload-calculator